Legislation, In force, Western Australia
Western Australia: Railway (Tilley to Karara) Act 2010 (WA)
An Act to authorise the construction of a railway from Tilley to Karara, and for related purposes.
          Western Australia
Railway (Tilley to Karara) Act 2010
Western Australia
Railway (Tilley to Karara) Act 2010
Contents
Part 1 — Preliminary
1. Short title 2
2. Commencement 2
Part 2 — Authority to construct railway
3. Authority to construct Tilley to Karara railway 3
Part 3 — Application of various written laws if construction of railway undertaken by contractor
4. Terms used 4
5. Application of Part 4
6. Aboriginal Heritage Act 1972 4
7. Environmental Protection Act 1986 4
Schedule 1 — Line of Tilley to Karara Railway
Notes
Compilation table 6
Defined terms
Western Australia
Railway (Tilley to Karara) Act 2010
An Act to authorise the construction of a railway from Tilley to Karara, and for related purposes.
The Parliament of Western Australia enacts as follows:
Part 1 — Preliminary
1. Short title
This is the Railway (Tilley to Karara) Act 2010.
2. Commencement
This Act comes into operation on the day on which it receives the Royal Assent.
Part 2 — Authority to construct railway
3. Authority to construct Tilley to Karara railway
A railway, with all necessary, proper and usual works and facilities in connection with the railway, may be constructed and maintained along the line described in Schedule 1.
Part 3 — Application of various written laws if construction of railway undertaken by contractor
4. Terms used
In this Part —
proposal has the meaning given in the Environmental Protection Act 1986 section 3(1);
Public Transport Authority means the Public Transport Authority of Western Australia established under the Public Transport Authority Act 2003 section 5;
specified means specified or described in the regulations.
5. Application of Part
This Part applies if the Public Transport Authority enters into a contract or arrangement with another person (the contractor) for the construction of all, or part, of the railway (the construction of the railway).
6. Aboriginal Heritage Act 1972
For the purposes of the construction of the railway, the Aboriginal Heritage Act 1972 applies in relation to any land required to be used for the construction of the railway as if the contractor were the owner of that land.
[Section 6 inserted: No. 23 of 2023 s. 32.]
7. Environmental Protection Act 1986
For the purposes of the construction of the railway, the Environmental Protection Act 1986 applies as if, despite anything else in that Act, the contractor had been nominated under section 38(6) of that Act as the person responsible for any proposal in respect of the construction of the railway.
Schedule 1 — Line of Tilley to Karara Railway
[s. 3]
1. The Tilley to Karara railway commences about 336.5 kilometres along the Avon Yard to Mullewa Railway line at point 1 in the sequence specified in the Table then continues, generally in an easterly or south‑easterly direction, along a straight line between each of the points in the sequence, and terminates at point 10, about 74 kilometres from point 1.
Table
Point no.  East    North
1          404000  6773000
2          418900  6773000
3          420000  6773700
4          423803  6774160
5          428775  6770355
6          443240  6770410
7          450215  6772010
8          467440  6771655
9          471475  6772630
10         474220  6771125
2. The course to be taken by the railway is shown as a red line on Public Transport Authority Plan 17‑C‑15‑1001.
Note for this Schedule:
Coordinate references are to Map Grid of Australia 1994 grid coordinates in Zone 50 of the Universal Transverse Mercator Grid System based on the Geocentric Datum of Australia.
Notes
This is a compilation of the Railway (Tilley to Karara) Act 2010 and includes amendments made by other written laws. For provisions that have come into operation see the compilation table.
Compilation table
Short title                                                          Number and year  Assent       Commencement
Railway (Tilley to Karara) Act 2010                                  25 of 2010       7 Jul 2010   7 Jul 2010 (see s. 2)
Aboriginal Cultural Heritage Act 2021 s. 351                         27 of 2021       22 Dec 2021  1 Jul 2023 (see s. 2(e) and SL 2023/40 cl. 2(b))
Aboriginal Heritage Legislation Amendment and Repeal Act 2023 s. 32  23 of 2023       24 Oct 2023  15 Nov 2023 (see s. 2(d) and SL 2023/161 cl. 2)
Defined terms
[This is a list of terms defined and the provisions where they are defined. The list is not part of the law.]
Defined term Provision(s)
construction of the railway 5
contractor 5
proposal 4
Public Transport Authority 4
specified 4
© State of Western Australia 2023.
This work is licensed under a Creative Commons Attribution 4.0 International Licence (CC BY 4.0). To view relevant information and for a link to a copy of the licence, visit www.legislation.wa.gov.au.
Attribute work as: © State of Western Australia 2023.
By Authority: GEOFF O. LAWN, Government Printer
        
      